Kimai (time)

Purpose

Kimai is the studio timesheet. Every billable and internal hour is logged here. Mindful Ops reads these entries for planned-vs-actual. Support tickets and MainWP work still need a timesheet on the matching customer and project.

Audience

Everyone who bills or tracks time.

Access / URL

Live: https://time.mindfuldesign.me

  1. Sign in with the provisioned account (usually studio email).
  2. Set profile timezone if prompted. Studio default for sync is Europe/Paris. Use the timezone actually worked in so start/stop times are accurate.
  3. Confirm the customers and projects for assigned work are visible. Admin maps or creates missing clients — do not invent a lookalike name.

Admins create API tokens for Ops sync only. Do not put tokens in tickets or git.

How it works

Ops syncs Kimai customers → Ops clients and Kimai projects → Ops projects (with auto-provision when enabled). Wrong Kimai metadata means wrong Logged hours on the planning grid.

Kimai Mindful Ops
Timesheets in the sync window Upserted; removed in Kimai → pruned in Ops
User / customer / project IDs Mapped to team members, clients, projects
Weekly totals Logged on the planning grid

The Ops Time page is a read-only browse of what sync already pulled. Fix hours in Kimai, then sync.

Day-to-day procedures

Log time

Step Action
1 Pick customer (client) then project (retainer, named job, or internal).
2 Start the timer when work begins, or add a timesheet after the fact with start/end (or duration).
3 Short description: what was done, ticket MD-n if support, site name if fleet work.
4 Stop the timer when switching task or finishing. Do not leave a timer running overnight.
5 Check the week view before logging off.

Record: client work (support, features, content, client meetings); internal studio work on the internal customer/project Ops specifies; client meetings on that client.

Do not record: the same hour in Ops, Deck, or a spreadsheet; another person’s Kimai user; passwords or card data in the description.

Customers and projects

Situation Action
Project not found Ask Ops before creating one (duplicates break reporting)
Worked on the wrong project Edit the timesheet in Kimai the same day
New client needed Admin creates it in Kimai and confirms the Ops map

Weekly close

Before the weekly planning review:

  1. All timers stopped.
  2. Each day has entries that match work done.
  3. Support work references MD-n where a ticket exists.
  4. If old entries were moved or deleted, Ops may need a full Kimai sync (incremental sync covers about a week).

Sources of truth

Kimai is the system of record for time. Ops Logged hours are a sync of Kimai.

Gotchas

Problem What to try
Cannot log in Password reset / Admin. Do not reuse an old Connecteam login
Empty customer list Permissions — Admin assigns teams
Ops Logged does not match Wait for hourly sync or Admin Sync now; confirm dates and project
Timer still running Stop it; split the entry if two clients were mixed

Kimai is hosted on the same ops account family as Planning (time.mindfuldesign.me). Outages: KnownHost / ops DNS — do not post infrastructure secrets here.